高低压开关柜安装时应注意的问题 - 行业观点 - 云南琅楚机电设备有限公司

Problems needing attention in installation of high and low voltage switchgear

更新时间:2017-11-22 12:55:26点击:548700 Industry Views

High and low voltage switchgear as a substation control equipment, can use the transformer to convert high-voltage power line into low-voltage power, and then low-voltage cabinet will be sent to each power distribution box, complete voltage conversion. High and low voltage switchgear in the installation process need to strictly comply with the safety technical operation process, to prevent installation errors. According to the installation process of high and low voltage switch cabinet, the problems needing attention in each installation link are described separately.
High and low voltage switchgear should pay attention to the installation of a lot of problems, to do a variety of inspection work.  One should check the switch cabinet assembly, two to check the switch cabinet components are installed, three to two times the connection check switch cabinet, four to check the switch cabinet installation inspection to check switch cabinet bus production, installation, check six cabinet accessories. The installation of high and low voltage switchgear is a more complex and systematic work. Only by distributing inspection and ensuring no error operation in each link can the normal and efficient operation of the functions of the high and low voltage switchgear be ensured.
1 switchgear cabinet assembly inspection
In theory, the switchgear cabinet assembly must meet the requirements of design drawings, but as the switchgear components there are some errors in the production process, so the cabinet assembly is also appropriate to relax the requirements, such as the diagonal size deviation just remain in no more than 2mm, can be considered to meet the requirements of design drawings. In addition, the size of the cabinet must be strictly in accordance with the relevant requirements, which involves the installation of the key parts of the cabinet or the installation parts of the precise parts. Secondly, when each component is connected, the connection and installation sequence should be ensured correctly, and the quality problems of the connecting rod should be examined so as to ensure the overall stability of the cabinet.
Again, when the installation is complete, should also be simple operation detection, such as door switch, detection door opening angle is equal to or greater than 90 degrees; the door opened or closed in the process without sloshing phenomenon is obvious; if there is not enough lubrication hinges squealing, metal friction noise. After checking the hardware facilities and ensure that no obvious quality problems, also need to support, to optimize external switchgear connecting cable and parts of other possible hidden safety problems, such as increased insulation wrapping, increase the cable inlet and outlet, to ensure the safe operation of switch cabinet.
Finally, when the above inspection is finished and the quality and safety problems are not found, the tools and sundries in the switch cabinet are cleaned up, and the inner and outer surface of the switch cabinet is cleaned with a cleaning tool to ensure no oil or dust.
Installation inspection of components in 2 switch cabinet
Kinds of components within the switchgear is complicated, the number is more, but overall it is some protection components such as circuit breaker, so in this part inspection of components, should pay attention to the following points: first, the number of components, types of inventory, ensure the material is complete, then according to the specific requirements of the design. Look at the drawings on components, types and number of compliance with the standard. Must be promptly replaced, the insufficient number of timely completion of the wrong type. Second, in strict accordance with the relevant operation process for the installation of components, to ensure that the installation position and installation of components are in line with the standard, while ensuring that the components connected to the conductor as flat and straight as possible, to avoid overlapping lines, cross. Third, reasonable arrangement of components and components, components and cabinet space distance between, not only to prevent the distance is too large, connecting wire distance is too long, increase the line fault probability; also to prevent the distance is too small, the operation is not convenient. Fourth, after the installation of all components, compared with the design drawings, determine the error after the power test, to ensure the normal connection between components. Fifth, do a good job cleaning after installation. In the installation process of components will remain a lot of thread, parts and iron filings, some of which will be attached to the surface of the components or inner layer, so the cleaning work must be careful, serious, to ensure that the details clean.
Inspection of the two wiring in the 3 switchgear cabinet
First, to ensure that components identification, terminal circuit name identification is complete, correct, neat and beautiful, meet the requirements. Second, components for wire connection, in accordance with the requirements of electrical equipment connection process, ensure horizontal vertical, as far as possible beautiful line. The electrical clearance and creepage distance in the third, second circuit should comply with the process requirements of the two wiring construction. Fourth, the conductor through the metal clapboard, bus, instrument door line to the fixed point, the two line should be protective treatment. The length of instrument door line is moderate, so that the door can be opened and closed freely. Fifth, choose all kinds of copper connector size, specifications meet the wiring mode of components terminals. Sixth, use the line clamp to flatten the terminals of the copper joint, and then connect the terminals to the terminals of the terminals. Pay attention to ensure the right connection mode, while the degree of moderate pressure: not only to prevent the line is too tight, the line in the late use prone to aging and fracture problems; but also to prevent the pressure line too loose, in a relatively short time, the head and the terminal fall off, resulting in connection broken. Seventh, the length of the stay wire is moderate and the fixed position is uniform. Such as grounding wire, N line, power line and so on, can use the diameter of about 6mm of metal round object, the conductor around the 3~5 ring; the two wiring must be according to the diagram construction, wiring correctly, accord with the requirements of the drawings, terminal connection reservation position is correct, unified.
Installation inspection of 4 switch cabinet
High voltage circuit breaker, low voltage drawer and other moving contacts, there is an appropriate amount of neutral grease; circuit breaker,